维普中文期刊产品整合服务
82篇 您的检索式:作者名="Knust"
    题名 作者 年代 出处 被引量
1Scheduling chains with identical jobs and constant delays on a single machine显示文摘Brucker Peter Knust Sigrid 2006Mathematical Methods of Operations Research2006,63,1:1
2Electrochemical reduc- tion of 5-chloro-2- (2,4-dichlorophenoxy)phenol (triclosan) in dimethylformamide显示文摘Knust K N Foley M P Mubarak M S 2010Journal of Electroanalytical Chemistry2010,638,10:1
3Climate change affects marine fishes through the oxygen limitation of thermal tolerance 显示文摘P6rtner H O Knust R 2007Sci- ence2007,315,:1
4List scheduling in a parallel machine environment with precedence constraints and setup times显示文摘HURINK J KNUST S 2001Operations Research Letters2001,29,5:1
5Tabu search algorithms for job-shopproblems with a single transport robot 显示文摘Hurink J Knust S 2005European Journalof Operational Research2005,162,1:1
6A branch and bound algorithm for the resource-constrained project scheduling problem 显示文摘Brucker P Knust S Schoo A 1998European Journal of Operational Research1998,107,2:1
7A tabu search algorithm for scheduling a single robot in a job-shop environment显示文摘Hurink J Knust S 2002Discrete Applied Mathematics2002,119,12:1
8Cytotoxic Necrotizing Factors (CNFs)-A Growing Toxin Family显示文摘KNUST Z SCHMIDT G 2010Toxins (Basel)2010,2,:1
9Climate change affects marine fishes through the oxygen limitation of thermal tolerance显示文摘P(o)rtner H O Knust R 2007Science2007,315,5808:1
10List scheduling in a parallel machine environment with precedence constraints and setup times显示文摘HURINK J KNUST S 2001Operations Research Letters2001,29,5:1
11Tabu search algorithms for job-shop problems with a single transport robot 显示文摘Hurink J Knust S 2005European Journal of Operational Research2005,162,1:1
12A branch and bound algorithm for the resource-constrained project scheduling problem显示文摘Brucker P Knust S Schoo A et ai 1998European Journal of Operational Research1998,107,2:1
13Complexity results for flow-shop and open-shop scheduling problems with transportation delays显示文摘Brucker P Knust S Cheng T C E 2004Annals of Operations Research2004,129,1:1
14A branch and bound algorithm for the resource-constrained project scheduling problem 显示文摘Brueker P Knust S Schoo A 1998European Journal of Operational Research1998,107,:1
15Climate change affects marine fishes through the oxygen limitation of thermal tolerance 显示文摘Portner H O Knust R 2007Science2007,315,5808:1
16Using a fluctuating tracer to estimate hyporheic exchange in restored and unrestored reaches of the Truckee River, Nevada, USA 显示文摘Knust A E Warwick J 1 2009Hydrological Processes2009,23,8:1
17Makespan minimization for flow-shop prob- lems with transportation times and a single robot 显示文摘Hurink J Knust S 2001Discrete Applied Mathematics2001,112,1:1
18Ten notes on equal-processing-time scheduling显示文摘Philippe Baptiste Peter Brucker Sigrid Knust Vadim G. Timkovsky 2004Quarterly Journal of the Belgian French and Italian Operations Research Societies2004,,2:1
19A branch and bound algorithm for the resource-constrained project scheduling problem显示文摘Brucker P Knust S Schoo A 1998European Journal of Operational Research1998,107,2:1
20A polynomial algorithm for P | pj=1, rj, outtree | ∑ Cj显示文摘Peter Brucker Johann Hurink Sigrid Knust 2003Mathematical Methods of Operations Research2003,,3:1
返回顶部 每页显示:
共5页 首页 上一页 第1页 下一页 末页 /5 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费