维普中文期刊产品整合服务
18篇 您的检索式:作者名="Brucker Peter"
    题名 作者 年代 出处 被引量
1Early prediction of major depression in chronic hepatitis C patients during peg-interferon α-2b treatment by assessment of vegetative-depressive symptoms after four weeks显示文摘AIM: To study the predictive value of the vegetative- depressive symptoms of the Zung Depression Rating Scale for the occurrence of depression during treatment with peg-interferon α-2b of chronic hepatitis C (CHC) patients. METHODS: The predictive value of vegetative- depressive symptoms at 4 wk of treatment for the occurrence of a subsequent diagnosis of major depressive disorder (MDD) was studied in CHC patients infected after substance use in a prospective, multi- center treatment trial in Belgium. The presence of vegetative-depressive symptoms was assessed using the Zung Scale before and 4 wk after the start of antiviral treatment. RESULTS: Out of 49 eligible patients, 19 (39%) developed MDD. The area under the ROC curve of the vegetative Zung subscale was 0.73, P = 0.004. The sensitivity at a cut-point of > 15/35 was 95% (95% CI: 74-100). The positive predictive value equalled 44% (95% CI: 29-60). CONCLUSION: In this group of Belgian CHC patients infected after substance use, antiviral treatment caused a considerable risk of depression. Seven vegetativedepressive symptoms of the Zung scale at wk 4 of treatment predicted 95% of all emerging depressions, at a price of 56% false positive test results.Geert Robaeys Jozef De Bie Marieke C Wichers Liesbeth Bruckers Frederik Nevens Peter Michielsen Marc Van Ranst Frank Buntinx 2007World Journal of Gastroenterology2007,13,43:4
2Scheduling chains with identical jobs and constant delays on a single machine显示文摘Brucker Peter Knust Sigrid 2006Mathematical Methods of Operations Research2006,63,1:1
3Scheduling identical jobs with chain precedence constraints on two uniform machines显示文摘 Johann Hurink Wieslaw Kubiak 1999Math Meth Oper Res1999,49,:1
4The complexity of mean flow time scheduling problems with release times显示文摘Philippe Baptiste Peter Brucker Marek Chrobak Christoph Dürr Svetlana A. Kravchenko Francis Sourd 2007Journal of Scheduling2007,,2:1
5Ten notes on equal-processing-time scheduling显示文摘Philippe Baptiste Peter Brucker Sigrid Knust Vadim G. Timkovsky 2004Quarterly Journal of the Belgian French and Italian Operations Research Societies2004,,2:1
6A polynomial algorithm for P | pj=1, rj, outtree | ∑ Cj显示文摘Peter Brucker Johann Hurink Sigrid Knust 2003Mathematical Methods of Operations Research2003,,3:1
7Resource-constrained project scheduling: Notation, classification, models, and methods 显示文摘Peter Brucker Andreas Drexl 1999European Journal of Operational Research1999,112,:1
8Scheduling and constraint propagation 显示文摘Brucker Peter 2002Discrete Applied Mathematics2002,123,123:1
9Resource-constrained project scheduling:Notation,classification,models,and methods显示文摘Peter Brucker Andreas Drexl 0,,41:1
10project scheduling: notation, classification, models, and methods 显示文摘Peter Brucker Andreas Drexl Roll Mfhring Klaus Neumann Erwin Pesch 1999European Journal of Operational Research (S0377-2217)1999,112,1:1
11Ten notes on equal-processing-time scheduling显示文摘Philippe Baptisite Peter Brucker SigridKnust 20044OR2004,2,:1
12Resource-constrained Project Scheduling and Timetabling显示文摘Peter Brucker Sigrid Knust 2001Lecture Notes in Computer Science2001,2079,1:1
13Resource-Constrained Project Scheduling:Notation,Classification,Model,and Methods显示文摘Peter Brucker Andreas Drexl Roll MOhring 1999European Journal of Operational Research1999,112,1:1
14Resource-constrained Project Scheduling: Notation, Classification, Models and Methods显示文摘Brucker Peter Drexl Andreas Mohring Rolf 1999European Journal of Operational Research1999,112,1:1
15Resource-constrained Project Scheduling : Notation, Classification, Models, and Methods 显示文摘Peter Brucker Andreas Drexl Rolf Mohring Klaus Neumann Erwin Pesch 1999European Journal of Operational Research1999,112,1:1
16A Branch and Bound Algorithm for the Resource-constraincd Project Scheduling Problem 显示文摘Peter Brucker Sigrid Knust Arno Schoo Olaf Thiele 1998European Journal of Operational Research1998,107,2:1
17The Job-Shop Problem and Immediate Selection显示文摘BRUCKER Peter JURISCH Bernd KRAMER Audreas 1994Annals of Operations Research1994,,50:1
18Resource-constrained project scheduling: Notation, classication, models, and methods 显示文摘Peter Brucker Andreas Drexl 1999European Journal of Operational Research1999,112,:1
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费