维普中文期刊产品整合服务
5篇 您的检索式:作者名="Gu Hongbiao"
    题名 作者 年代 出处 被引量
1Heme oxygenase-1 ameliorates LPS-induced acute lung injury correlated with downregulation of interleukin-33显示文摘Hui Yin Xiangyong Li Baohong Yuan Bobin Zhang Shilian Hu Hongbiao Gu Xiaobao Jin Jiayong Zhu 2011International Immunopharmacology2011,,12:1
2Sirolimus ameliorates inflammatory responses by switching the regulatory T/T helper type 17 profile in murine colitis显示文摘Hui Yin Xiangyong Li Bobin Zhang Tao Liu Baohong Yuan Qian Ni Shilian Hu Hongbiao Gu 2013Immunology2013,,4:1
3Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling显示文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.Peng Qiao Shuangshuang Lan Hongbiao Gu Zhengtan Mao 2024Computer Modeling in Engineering & Sciences2024,139,5:0
4Application and Research Progress of PRB for Groundwater Pollution Remediation显示文摘Because of its long processing time,low operating cost,simultaneous processing of multiple pollutants,PRB( permeable reactive barrier) is a commonly used technique for groundwater pollution remediation in western countries. But relative research about the PRB technology in China is still in its infancy. We reviewed the PRB structure,PRB repair mechanism and application progress at home and abroad. Aiming at the problems of PRB technology at reaction material selection,pollutant repair mechanism,removal of various pollution components and site installation design,development direction of the PRB technology was prospected.Li Haiting Chi Baoming He Cunzhe Gu Hongbiao Jiang Jiyi Kong Huimin Zhang Ying 2015Meteorological and Environmental Research2015,6,5:0
5Adaptability Analysis of Fluctuating Traffic for IP Switching and Optical Switching显示文摘The technological development of smart devices and Internet of Things(IoT)has brought ever-larger bandwidth and fluctuating traffic to existing networks.The analy⁃sis of network capital expenditure(CAPEX)is extremely important and plays a fundamen⁃tal role in further network optimizing.In this paper,an adaptability analysis is raised for IP switching and optical transport network(OTN)switching in CAPEX when the service bandwidth is fluctuating violently.This paper establishes a multi-layer network architec⁃ture through Clos network model and discusses impacts of maximum allowable blocking rate and service bandwidth standard deviation on CAPEX of IP network and OTN network to find CAPEX demarcation point in different situations.As simulation results show,when the bandwidth deviation mean rate is 0.3 and the maximum allowable blocking rate is 0.01,the hardware cost of OTN switching will exceed IP switching as the average band⁃width is greater than 6100 Mbit/s.When the service bandwidth fluctuation is severe,the hardware cost of OTN switching will increase and exceed IP switching as the single port rate is allowed in optical switching.The increasing of maximum allowable blocking rate can decrease hardware cost of OTN switching.Finally,it is found that Flex Ethernet(FlexE)can be used to decrease CAPEX of OTN switching greatly at this time.LIAN Meng GU Rentao JI Yuefeng WANG Dajiang LI Hongbiao 2021ZTE Communications2021,19,1:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费