维普中文期刊产品整合服务
72篇 您的检索式:作者名="Pishvaee"
    题名 作者 年代 出处 被引量
1Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty显示文摘M.S. Pishvaee S.A. Torabi J. Razmi 2011Computers & Industrial Engineering2011,,2:1
2A memetic algorithm for bi-objective integrated forward/ reverse logistics network design显示文摘PISHVAEE S FARAHANI R Z DULLAERT W 2010Computers and Operations Research2010,37,6:1
3A yeast DNA J protein required for uncoating of clathrin-coated vesicles in vivo显示文摘PISHVAEE B COSTAGUTA G YEUNG B G 2000Nat Cell Biol2000,2,:1
4A possibilistic programming approach for closed-loop supply chain network design un- der uncertainty 显示文摘Pishvaee M S Torabi S A 2010Fuzzy Sets and Systems2010,161,20:1
5Credi- bility-based fuzzy mathematical programming model for green logistics design under uncertainty显示文摘PISHVAEE M A TORABI S A RAZMI J 2012Com- puters and Industrial Engineering2012,62,2:1
6A robust optimization approach to closed-loop supply chain network design under uncertainty显示文摘Pishvaee M S Rabbani M Torabi S A 2011Applied Mathematical Modeling2011,35,:1
7A Robust Optimization Approach to Closed- Loop Supply Chain Network Design under Uncertainty 显示文摘Pishvaee S Rabbani M 2011Applied Mathematical Modelling2011,35,2:1
8A memetic algo- rithm for bi-objective integrated forward/reverse logistics net- work design显示文摘Pishvaee M S Farahani R Z Dullaert W 2010Computers & Operations Research2010,37,6:1
9Apossibilitic programming approach for closed-loop supply chain network design under uncertainty显示文摘Pishvaee M S Torabi S A 0,,:1
10A possibilistic programming ap- proach closed-loop supply chain network design under un- certainty显示文摘Pishvaee M S Torabi S A 2010Fuzzy Setsand Systems2010,161,20:1
11A Me- metic Algorithm for Bi-objective Integrated Forward/Reverse Logistics Network Design显示文摘PISHVAEE M R FARAHANI R Z DULLAERT W 2010Comput Oper Res2010,37,6:1
12A possibilistic programming ap- proach for closed-loop supply chain network design under uncertainty显示文摘Pishvaee M S Torabi S A 2010Fuzzy Sets and Systems2010,161,20:1
13Robust possibilistic programming for socially responsible supply chain network design: A new approach显示文摘M.S. Pishvaee J. Razmi S.A. Torabi 2012Fuzzy Sets and Systems2012,,:1
14A robust optimization approach to closed-loop supply chain network design under uncertainty显示文摘Pishvaee M S Rabbani M Torabi S A 2011Applied Mathematical Modelling2011,35,2:1
15A possibilistic programming approach for closed-loop supply chain network design under uncertainty显示文摘M.S. Pishvaee S.A. Torabi 2010Fuzzy Sets and Systems2010,,20:1
16A memetic algorithm for bi-objective integrated forward/reverse logistics network design显示文摘Pishvaee S M Farahani R Z Dullaert W 2010Computers & Operations Research2010,37,:1
17A robust op- timization approach to closed-loop supply chain network design under uncertainty显示文摘PISHVAEE M S RABBANI M TORABI S A 2011Applied Mathematical Modelling2011,35,2:1
18A stochastic optimi-zation model for integrated forward/reverse logistics network design显示文摘Pishvaee M S Jolai F Razmi J 2009Journal of Manufacturing Sys- tems2009,28,4:1
19A robust optimization approach to closed-loop supply chain network design under uncertainty显示文摘Pishvaee M S Rabbani M Torabi S A 0,,35:1
20Robust possibilistic programming for socially responsible supply chain network design:A new approach显示文摘Pishvaee M S Razmi J Torabi S A 2012Fuzzy sets and systems2012,206,:1
返回顶部 每页显示:
共4页 首页 上一页 第1页 下一页 末页 /4 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费