维普中文期刊产品整合服务
1篇 您的检索式:作者名="Andrew S.Partlow"
    题名 作者 年代 出处 被引量
1Water quality impacts of small-scale hydromodification in an urban stream in Connecticut, USA显示文摘Introduction:Construction activities in and along urban streams increase the sediment input into surface waters,causing an overall decline in water quality and aquatic ecosystems.In this case study,we investigate the water quality impacts of local hydromodification in an urban stream(discharge 0.4 m^(3)/s).At the site of interest,workers removed a stream crossing consisting of an embankment with culverts and replaced it with a small bridge(single span of 25 m)in an effort to improve flow capacity.Methods:Water samples were taken at four sites along the North Branch Park River in Connecticut,Northeastern United States.Turbidity and dissolved oxygen(DO)were measured in situ,and nitrate and total phosphorus(TP)were measured in the laboratory.Benthic macroinvertebrate samples were also collected and analyzed for taxon richness and Shannon-Weaver species diversity.Data were compared between upstream and downstream sites and before,during,and after hydromodification.We used one-way ANOVA combined with the post hoc Turkey test to derive statistical significance.Results:During construction,turbidity increased temporarily by 60.9%[from 2.48 Nephelometric Turbidity Units(NTU)over ambient to 4.00 NTU].Once construction was completed,DO increased locally from 11.0 to 13.0 mg/L.Benthic macroinvertebrate taxon richness and species diversity declined by 61.6 and 32.6%respectively,with no recovery observed in the year following construction.Water quality was only affected within 50 m downstream.Nitrate and TP concentrations were unaffected.Conclusions:Small-scale hydromodification temporarily increased the turbidity as a result of increased sediment input,approaching the maximum level for clean water(5 NTU).Benthic macroinvertebrate communities declined in the immediate downstream vicinity of construction but are expected to recover soon given that turbidity recovered to pre-construction levels,and DO increased.These outcomes emphasize that environmental assessment is important not only for large-scale hydromodification but also for smaller scale stream modifications.Bin Zhu Daniel S.Smith Anthony P.Benaquista Dylan M.Rossi Betsy M.Kadapuram Man Lok Yu Andrew S.Partlow Nathan R.Burtch 2018Ecological Processes2018,7,1:1
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费