维普中文期刊产品整合服务
共被期刊论文引用了4次 您的检索式:您选中1篇文献正在查看引证文献汇总
    题名 作者 年代 出处 被引量
1基于电力电子换流器的变压器经济运行管控技术显示文摘为提高变压器的运行效率,提出一种基于电力电子换流器的变压器经济运行管控技术,通过有效治理负载中的无功电流、谐波电流及三相不平衡电流,对变压器进行经济运行管控,最终提高变压器的运行效率。经过对电力电子换流器的拓扑和控制方法的研究,搭建了系统仿真模型,完成了仿真论证。结果表明,提出的电力电子换流器及控制方法,可实现对变压器的经济运行管控,最终提高变压器的运行效率。袁方 王国权 张立智 李瑞强 严江波 洪叶 李万军 2021电网与清洁能源2021,37,12:4
2Research on key technologies of deduction of multinational power trading in the context of Global Energy Interconnection显示文摘When transnationalized electricity trade is conducted in the context of Global Energy Interconnection(GEI),the transaction settlement usually has a long cycle and high cost and is influenced by the volatility of the exchange rate.It is thus necessary to overcome the problems associated with the transaction settlement,change in the trading model data,and trading strategy in the transnational transaction deduction.To overcome the problem of trade settlement,this paper proposes the use of a digital currency(energy currency)for the cross-border electricity trading settlement based on the special drawing rights of the International Monetary Fund,which is controlled by the Global Energy Interconnection Development and Cooperation Organization(GEIDCO),to enable the proposed currency to become a stable digital currency.The traders can use the energy coins as a unit of currency for quotes,combined with the data pertaining to the changes in the energy information obtained from the GEI framework and data regarding the optimally extrapolated reference trading indicators.To realize the implementation of the multi-trader concurrent transaction deduction using a microservice architecture,this paper proposes a method of computing the microservice and synchronous interaction among the traders,based on the database table data,because the large amount of computation is required to be accomplished asynchronously with a single process.The key technology behind these cross-national electricity trading simulations can not only enable the GEI transnational traders to performed daily real-time trading,but it also demonstrates the advantages of the rapid settlement of the energy currency and the realization of a stable payment in the global energy interconnection cross-border electricity trading.Jijie Huang Changnian Lin Haiming Zhou Zhengqing Xu Chunzhe Lin 2019Global Energy Interconnection2019,2,6:1
3Utilization of cross-regional interconnector and pumped hydro energy storage for further introduction of solar PV in Japan显示文摘The amount of solar PV installed capacity has steadily increased to 44.5 GW at the end of FY2017,since the introduction of the Feed in Tariff(FiT)to Japan in 2012.On the other hand,since the first curtailment of solar PV was conducted on October 13th,2018 in the Kyushu area,the curtailment has been frequently executed including wind power after that.In this study,cross-regional interconnector and pumped hydro energy storage(PHES)are focused on mitigating curtailment.In Japan,there are 9 electric power areas which connected each other by cross-regional interconnectors.According to the historical operation,cross-regional interconnectors were secured as emergency flexible measures,but after the implicit auction was started from October 2018,it is used on merit order.Regarding a PHES in Japan,they have been built with nuclear power plants for several decades.Because the output of nuclear power generation is constant,so the PHES is used to absorb the surplus at nighttime when the demand declines.All nuclear power plants in Japan have been shut down after the accident at the Fukushima Daiichi Nuclear Power Plant following the Great East Japan Earthquake that occurred on March 11th,2011.There are several nuclear power plants that have been restarted(9 reactors,as of August 2019).In this study,the amount of curtailment for solar PV in the Kyushu area is sent to the Chugoku area using the cross-regional interconnector(Kanmon line).Then,the PHES in the Chugoku area is pumping with low price.Because the spot price in the market is low when the curtailment is executed.After that,the PHES is generating at night with high price when the solar PV is not generating.It makes a profit by the deference for the cost of pumping and the revenue of generating by the PHES.As a calculation result,for one week from May 2nd to 8th,2019,a profit becomes 152.2 million JPY(about 1.22 million EUR).For this purpose,it is necessary to raise the operation capacity of the cross-regional interconnector up to the rated capacity with the frequency control function of solar PV instead of the capacity to keep frequency in the event of an accident.This will allow the further introduction of solar PV in Japan.Shota Ichimura 2020Global Energy Interconnection2020,3,1:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费