|
|
|
题名
|
作者
|
年代
|
出处
|
被引量
|
| 1 | Assessing risk and uncertainty inherent in Chinese highway projects using AHP 显示文摘 | Tarek Zayed Mohamed Amer Jiayin Pan | 2007 | Project Management2007,,5: | 1 |
| 2 | Pile construction productivity assessment显示文摘 | Tarek M Zayed Daniel W Halpin | | 0,,06: | 1 |
| 3 | Prototype model for build operate transfer risk assessment 显示文摘 | Tarek M Zayed | 2002 | Journal of Management in Engineering2002,,1: | 1 |
| 4 | Prototype model for build- operate-transfer risk assessment 显示文摘 | Tarek M Zayed S Luh M C | 2002 | Journal of Manage- ment in Engineering2002,18,1: | 1 |
| 5 | Resourcemanagement of bridge deck rehabilitation : Jacques cartier bridge case study显示文摘 | Zhang Cheng Zayed Tarek Hammad Amin | 2008 | Journal of Construction Engineering and Management2008,134,5: | 1 |
| 6 | Assessing risk and uncertainty inherent in Chinese highway projects using AHP显示文摘 | Tarek Zayed Mohamed Amer Jiayin Pan | 2007 | International Journal of Project Management2007,,4: | 1 |
| 7 | A stochastic diagnostic model for subway stations 显示文摘 | NABIL SEMAAN TAREK ZAYED | 2010 | Tunnelling and Underground Space Technology2010,25,1: | 1 |
| 8 | Prototype model for build-operate-transfer risk assessment显示文摘 | Tarek M Zayed S Chang L M | 2002 | Journal of Management in Engineering2002,18,1: | 1 |
| 9 | Assessing risk and uncertainty inherent in Chinese highway projects using AHP 显示文摘 | Tarek Zayed Mohamed Amer Jiayin Pan | 2008 | International Journal of Project Management2008,26,4: | 1 |
| 10 | Pile construction productivity assessment显示文摘 | Tarek M Zayed Daniel W Halpin | 2005 | Jounal of Construction Engineering and Manage- ment2005,131,6: | 1 |
| 11 | Prototype model for build-operate-transfer risk assessment 显示文摘 | Tarek M Zayed S Chang L M | 2002 | Journal of Management in Engineering2002,18,1: | 1 |
| 12 | Review of analytical methods for stress and deformation analysis of buried water pipes considering pipe-soil interaction显示文摘Buried water pipelines are vulnerable to fail or break due to excessive loading or ground displacements.Accurate evaluation of pipe performance and serviceability relies on the proper understanding of pipe-soil interactions(PSI).Analytical methods are important approaches to studying PSI.However,a systematic and thorough literature review to analyze the existing research trends,technological achievements and future research opportunities is not available.This work investigates analytical methods that analyze the stress and deformation of pipes in terms of cross-sectional,transverse and longitudinal PSI problems.First,scientometric analysis is performed to acquire relevant research works from online databases and analyze the existing data of influential authors,productive research sources and frequent key word occurrence in the fields of interest.Second,a qualitative discussion is performed in the three categories of PSI:(1)cross-sectional,including ovalization and circumferential behaviours;(2)transverse,including seismic fault crossing,weak soil zones,ground settlement and pipe uplift;and(3)longitudinal.Third,six research opportunities are discussed,including the role of friction in cross-sectional deformation,combined effects of bending and compression,choice of soil reaction models and calibration of key parameters,effect of pipe flaws,soil spatial variability and behaviours of curved pipes.This study helps beginners familiarize themselves with PSI analytical methods and provides experienced researchers with ideas for future research directions. | Yingxu Huo Sherif Mohsen Mohamed Hassan Gomaa Tarek Zayed Mohamed Meguid | 2023 | Underground Space2023,,6: | 0 |
| 13 | 使用比例数据模型自动检测排污管道闭路电视检查中的异常显示文摘排污管的管道状况信息通常使用闭路电视检查(CCTV)收集。此外,为了评估管道的状况,数据应当由已认证的操作者处理,造成时间和成本的浪费,并且还会因为操作者的熟练或疲劳程度而易于出错。自动检测异常可以减少检查的时间和成本,同时确保评估的准确性和质量。然而,考虑到排污管道中各种类型以及多种模式的缺陷,使用计算机视觉技术来检测似乎是困难的。本文提出了一种有效的异常检测算法,以支持从CCTV检查视频中获得的数据来自动检测排污管道缺陷。在该模型中,理论地采用了用于比例数据建模的隐马尔可夫模型(HMM),评估了以排污管道闭路电视视频为示例的异常检测中的性能。这种算法包括被认为是正常的建模条件和该模型的监测异常值。 | Saeed Moradi Tarek Zayed Alaa H. Hawari 钟海晨 | 2017 | 非开挖技术2017,0,2: | 0 |