维普中文期刊产品整合服务
3篇 您的检索式:作者名="Operation Team"
    题名 作者 年代 出处 被引量
1Extracted Proton Energy Measurement for CYCIAE-100显示文摘Since the first beam was got in 2014,the100 MeV compact cyclotron(CYCIAE-100)has been into the operation process.75-100 MeV proton beams were extracted by the stripping extraction mode.The extracted proton energy for CYCIAE-100 was finished measurement by the experts in last year.The Bragg peak position in the water is fixed for the extracted protonAN Shizhong WANG Feng WANG Lei LYU Yinlong GE Tao WEN Lipeng WEI Sumin CAO Lei HUANG Peng Operation Team 2017Annual Report of China Institute of Atomic Energy2017,,1:0
2Testing of Extracting Proton Beams Simultaneously in Dual Direction for CYCIAE-100显示文摘The 100 MeV compact cyclotron(CYCIAE-100)has been into the operation process.75-100 MeV proton beams with the beam current of200μA are extracted by the stripping extraction mode.Two sets of stripping extraction systems are installed in opposite direction of northAN Shizhong LYU Yinlong WEN Lipeng CAO Lei LU Xiaotong GE Tao WEI Sumin HUANG Peng WANG Feng WANG Lei Operation Team 2017Annual Report of China Institute of Atomic Energy2017,,1:0
3ADS前端超导直线加速器射频超导系统稳定性提升显示文摘The main goal of the Chinese ADS front-end demo superconducting linac(CAFe)is to develop the key technologies of a superconducting front-end linac and demonstrate high power continuous-wave(CW)proton beam with 10 mA for Accelerator Driven System(ADS).One of the crucial challenges is the reliability and availability of the accelerator.By the end of 2017,a CW beam commissioning test around 27 h was made.The majority of beam trips is from the SRF system in the test.Therefore,our intense effort was to improve the reliability of the SRF system in 2018,which are described below.Jiang Tiancai SRF Operation Team 2018IMP & HIRFL Annual Report2018,,1:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费