|
|
|
题名
|
作者
|
年代
|
出处
|
被引量
|
| 1 | Overburden management in open pits: options and limits in large limestone quarries显示文摘The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project. | Claudio Oggeri Taddeo Maria Fenoglio Alberto Godio Raffaele Vinai | 2019 | International Journal of Mining Science and Technology2019,29,2: | 6 |
| 2 | Laboratory tests to study the influence of rock stress confinement on the performances of TBM discs in tunnels显示文摘To clarify some aspects of rock destruction with a disc acting on a high confined tunnel face, a series of tests were carried out to examine fracture mechanisms under an indenter that simulates the tunnel boring machine (TBM) tool action, in the presence of an adjacent groove, when a state of stress (lateral confinement) is imposed on a rock sample. These tests proved the importance of carefully establishing the optimal distance of grooves produced by discs acting on a confined surface, and the value (as a mere order of magnitude) of the increase of the thrust to produce the initiation of chip formation, as long as the confinement pressure becomes greater. | N. Innaurato C. Oggeri P. Oreste R. Vinai | 2011 | International Journal of Minerals,Metallurgy and Materials2011,18,3: | 4 |
| 3 | Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress Confinement显示文摘 | N. Innaurato C. Oggeri P. P. Oreste R. Vinai | 2007 | Rock Mechanics and Rock Engineering2007,,5: | 3 |
| 4 | Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress Confinement显示文摘 | N. Innaurato C. Oggeri P. P. Oreste R. Vinai | 2007 | Rock Mechanics and Rock Engineering2007,,5: | 1 |
| 5 | Screw conveyor device for laboratory tests on conditioned soil for EPB tunneling op- eration 显示文摘 | Peila D Oggeri C Vinai R | 2007 | Journal of Geotechnical and Geoenviron- mental Engineering2007,133,12: | 1 |
| 6 | Experimental and numerical studies on rock breaking with TBM tools under high stress confinement显示文摘 | Innaurato N Oggeri C Oreste P P | 2007 | Rock Mechanics and Rock Engineering2007,40,5: | 1 |
| 7 | Soil conditioning of sand for EPB applications: a laboratory research 显示文摘 | Raffaele Vinai Claudio Oggeri Daniele Peila | 2008 | Tunnelling and Underground Space Technology2008,23,3: | 1 |
| 8 | Soil conditioning of sand for EPB applications: a laboratory research显示文摘 | VINAI R OGGERI C PEILA D | 2008 | Tunnelling and Underground Space Technology2008,23,3: | 1 |
| 9 | Quality in tunnelling: ITA-AITES Working Group 16 Final report显示文摘 | Claudio Oggeri Gunnar Ova | 2003 | Tunnelling and Underground Space Technology incorporating Trenchless Technology Research2003,,3: | 1 |
| 10 | Soil conditioning of sand for EPB applications: a laboratory research显示文摘 | Vinai R Oggeri C Peila D | 2008 | Tunneling and Underground Space Technology2008,23,3: | 1 |
| 11 | Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress Confinement显示文摘 | N. Innaurato C. Oggeri P. P. Oreste R. Vinai | 2007 | Rock Mechanics and Rock Engineering2007,,5: | 1 |
| 12 | Using the slumping test to assess the behavior of conditioned soil for EPB tunneling显示文摘 | PEILA D OGGERI CBORIO L | 2009 | Environmental&Engineering geoscience2009,,3: | 1 |
| 13 | Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress Confinement显示文摘 | N Innaurato C Oggeri P P Oreste | | 0,,05: | 1 |
| 14 | Experimental and numerical studies on rock breaking with TBM tools under high stress confinement显示文摘 | INNAURATO N OGGERI C ORESTE P P | 2007 | Rock Mechanics and Rock Engineering2007,40,5: | 1 |
| 15 | Experimental and numericalstudies on rock breaking with TBM tools under high stress confinement显示文摘 | Innaurato N Oggeri C Oreste P P | 2007 | Rock Mechanics and Rock Engineering2007,40,5: | 1 |
| 16 | Soil conditioning of sand for EPB applications: A laboratory research显示文摘 | Raffaele Vinai Claudio Oggeri Daniele Peila | 2007 | Tunnelling and Underground Space Technology incorporating Trenchless Technology Research2007,,3: | 1 |
| 17 | Screw conveyor device for laboratory tests on conditioned soil for EPB tunneling operations 显示文摘 | Peila D Oggeri C Vinai R | 2007 | Journal of Geoteehnical and Geoenvironmental Engineering2007,133,12: | 1 |
| 18 | Experimental and numerical studies on rock breaking with TBM tools under high stress confinement 显示文摘 | lnnaurato N Oggeri C Oreste P P | 2007 | Rock Mechanics and Rock Engineering2007,40,5: | 1 |
| 19 | Soil conditioning of sand for EPB applications: A laboratory research显示文摘 | VINAl R OGGERI C PElLA D | 2008 | Tunneling and Underground Space Technology2008,23,3: | 1 |
| 20 | Soil conditioning of sand for EPB applications: A laboratory research 显示文摘 | Vinai R Oggeri C Peila D | 2008 | Tunnelling and Underground space Technology2008,23,3: | 1 |