维普中文期刊产品整合服务
1篇 您的检索式:作者名="Nathan D.Jacob"
    题名 作者 年代 出处 被引量
1高压直流换流站穿墙套管的局部放电在线测量(英文)显示文摘An online partial discharge(PD) measurement performed on a high voltage direct current(HVDC) wall bushing successfully identified the presence of internal discharges.The wall bushing is a sulfur hexafluoride gas-insulated bushing,rated for 500 kV dc and terminated on a thyristor-controlled HVDC converter bridge.The measurement of PD within the HVDC station environment is particularly challenging due to the high levels of electromagnetic noise caused by thyristor switching events and external air-corona from the neighboring high-voltage equipment.An additional challenge is the''mixed'voltage stress on the bushing insulation,which has both ac and dc high-voltage components.There are also fast transients during the firing of thyristors in the HVDC conversion process that cause added stress to the insulation.As a result,the analysis and interpretation of PD data for HVDC equipment is more complex;PD pulses may occur in response to the ac,dc,or switching transient voltage stresses.In this paper,an online PD measurement strategy for noise filtering and isolation of PD sources within the bushing are discussed.The PD measurement data is plotted on a phase-resolved diagram where the line supply power cord voltage was used as a reference. The phase-resolved diagram appears to suggest that the fast transients,caused during switching,trigger some PD events.Measurements were also performed with the aid of a modern PD measurement instrument having noise separation capabilities.The findings from the online PD measurements are verified with physical evidence,found after the bushing was removed from service,suggested internal PD had occurred inside the bushing.Nathan D.Jacob William M.McDermid Behzad Kordi 2011高电压技术2011,37,11:8
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费