维普中文期刊产品整合服务
5篇 您的检索式:作者名="Krishna Kumar Patel"
    题名 作者 年代 出处 被引量
1Heat pump assisted drying of agricultural produce - an overview 显示文摘Krishna Kumar Patel Abhijit Kar 2012Journal of Food Science and Technology2012,49,2:1
2Vari- able Forgetting Factor LS Mgorithm for Polynomial Channel Model显示文摘Amit Kumar Kohli Amrita Rai Meher Krishna Patel 2011ISRN Signal Processing2011,,2011:1
3Machine vision system:a tool tbr quality inspection of food and agricultural products 显示文摘Krishna Kumar Patel 2012Journal of Food Science and Technology2012,49,2:1
4Influence of wellhead pressure and water cut in the optimization of oil production from gas lifted wells显示文摘The worldwide increase in energy demand necessitates the development and optimization of marginal oil fields for sustenance.In this regard,effective and economic production of fluids are heavily relied upon the artificial lift techniques as the reservoir's natural energy may not be able to deliver the fluids to the surface.Gas lift is a widely practised and successful method that is suitable for rejuvenating the oil production from such fields.In this study,the influence of critical parameters like water cut,wellhead pressure(WHP)and gas-lift gas injection rate on the output from a gas lifted well was analysed.A significant reduction in the oil production was observed with the increase in water cut.For a fixed gas injection rate of 1 Mmscf/day,the production decreased by 26.90%when the water cut increased from 15%to 30%and further by 50.80%when the water cut reached 45%.An increase in the gas injection rate from 1 Mmscf/day to 8 Mmscf/day resulted in an increase in the production rate by 29.21%,40.48%and 56.56%for 15%,30%,and 45%water cut conditions,respectively.It was observed that there is a drop in the oil rate with the increase in WHP for a constant gas injection rate.An increase in the WHP from 100 psi to 300 psi resulted in a drop in the oil production rate by 11.01%,11.78%and 12.74%for 15%,30%and 45%water cut conditions,respectively.The study sheds light on the significance of optimizing the critical parameters to maximize the production from a well,with severely affected productivity,using a continuous gas lift system.S.Hari Shanker Krishna Manav Patel Pooja Bhatia Rakesh Kumar Vij 2022Petroleum Research2022,7,2:1
5Infilled Reinforced Concrete Beams for Sustainable Construction显示文摘Patel Rakesh Dubey Sheo Kumar Pathak Krishna Kant 2013Journal of Civil Engineering and Architecture2013,7,11:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费