维普中文期刊产品整合服务
1篇 您的检索式:作者名="B.C.Kim"
    题名 作者 年代 出处 被引量
1Current Status of the KSTAR Engineering显示文摘As there is substantial progress in the KSTAR tokamak engineering, all the major structures and sub-systems are under fabrication and in procurement phase.The vacuum vessel,port,cryostat cylinder,lid,and bellows are being rigorously fabricated in the factory.The lower part of the KSTAR such as cryostat base and gravity support has been almost finished in its fabrication.There are also great progresses and significant results in manufacturing of the superconducting magnet,including four Toroidal Field (TF) coils,lower and upper PF7 coils which are the largest Poloidal Field (PF) coils.The TF00 coil,which has been made for test and back-up of the TF magnet system,was successfully tested in the cool-down and current charging.As the fabrications and procurements of major structures have been actively proceeded,assembly works were also launched from Aug.2003.More detailed description on these status,results,and plans will be described in this paper.J.S.Bak K.Kim C.H.Choi Y.K.Oh B.C.Kim N.I.Her H.L.Yang G.S.Lee the KSTAR Team 2004Plasma Science and Technology2004,6,1:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费