维普中文期刊产品整合服务
9篇 您的检索式:作者名="Alexandre Dolgui"
    题名 作者 年代 出处 被引量
1A Model for Supply Planning Under Lead Time Uncertainty 显示文摘Alexandre Dolgui Mohamed-Aly Ould-Louly 2002International Journal Production Economics2002,78,:1
2Introduction to design and analysis of production systems显示文摘Ronald G. Askin Alexandre Dolgui Jean-Marie Proth 2009International Journal of Production Economics2009,,2:1
3A decomposition based solution algorithm for U-type assembly line balancing with interval data显示文摘Qncu Hazr Alexandre Dolgui 2015Computers & Operations Research2015,59,7:1
4Special section:Advances in manufacturing systems and logistics显示文摘Gerard Morel Alexandre Dolgui 0,,31:1
5Special section:Planning and control of manufacturing and logistic systems显示文摘Natalia Bakhtadze Alexandre Dolgui 0,,34:1
6The MPS Parameterization under Lead Time Uncertainty显示文摘Ould-Louly Mohamed-Aly Dolgui Alexandre 2004International Journal of Production Economics2004,90,3:1
7Pricing Strategies and Models显示文摘Alexandre Dolgui Jean-Marie Proth 2010Annual Reviews in Control2010,,34:1
8PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS显示文摘这篇论文在计划的一个材料要求(MRP ) 处理计划的铅时间计算的问题在随机的铅时间下面的环境。目的是最小化成立和 backlogging 费用的和。建议途径基于库存控制决定变量在哪儿是整数的分离时间。系统的二种类型被考虑:连续生产的多水平和汇编系统。为连续生产系统(在每水平的部件的一种类型) ,一个数学模型被建议。然后,这个模型等价于众所周知的分离报童模型,这被证明。这直接在计划的铅时间提供最佳的价值。为多铺平汇编系统,一个奉献模型被建议,变量和目的工作的决定的一些性质被证明。这些性质被用来在客观功能上在决定变量和更低、上面的界限上计算更低、上面的限制。获得的限制和界限打开可能性开发例如,使用一个分支和界限途径的一个有效优化算法。纸与相应证明和几个数字例子详细论述建议模型。建议模型的一些优点和这研究的观点被讨论。Faicel HNAIEN Alexandre DOLGUI Mohamed-Aly OULD LOULY 2008Journal of Systems Science and Systems Engineering2008,17,2:1
9Special issue: Advancing supply chain resilience for excellence in the post-pandemic era显示文摘The COVID-19 pandemic has brought unprecedented severe challenges to global supply chains and has triggered discussion about supply chain resilience(SCR).In the post-pandemic era,although residents’consumption has rebounded under the stimulation of the government’s financial policies and the disruption of the supply chain has been alleviated,firms still face great challenges of restarting their supply chains.On the one hand,the global supply chain is still fragile.The outbreak of the epidemic may continue,and the risk of supply chain disruption cannot be ignored.On the other hand,the manufacturer’s production cost is further increased due to the substantial increase in international raw material prices,labor costs and transportation costs,and the production cycle is further prolonged.Therefore,SCR in the post-epidemic era is subject to multiple challenges from the external environment,as well as both supply and demand sides.Tsan-Ming CHOI Alexandre DOLGUI Guo LI Suresh P.SETHI Xiaohang YUE 2023Frontiers of Engineering Management2023,10,1:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费