维普中文期刊产品整合服务
共被期刊论文引用了2次 您的检索式:您选中1篇文献正在查看引证文献汇总
    题名 作者 年代 出处 被引量
1Heavy rockbursts due to longwall mining near protective pillars:A case study显示文摘Rockburst represents a very dangerous phenomenon in deep underground mining in unfavourable conditions such as great depth, high horizontal stress, proximity of important tectonic structures, and unmined pillars. The case study describes a recorded heavy rockburst in the Czech part of the Upper Silesian Coal Basin, which occurred during longwall mining near the protective pillar. The artificial dividing of geological blocks and creation of mining protective pillars(shaft pillars, crosscut pillars etc.) is a dangerous task in light of rockbursts occurring mainly due to overstressing of remaining pillars. A simple model of this situation is presented. Natural and mining conditions are analysed and presented in detail as well as registered seismicity during longwall mining in the area. Recorded rockbursts in the area of interest are described and their causes discussed. Many rockbursts near protective pillars were recorded in this mining region. Methodical instructions for rockburst prevention in proximity of protective pillars as well as for gates driving were devised based on the evaluation of rockburst causes. The paper presents these principles for prevention.Petr Konicek Jan Schreiber 2018International Journal of Mining Science and Technology2018,28,5:9
2Mechanical model for controlling floor heave in deep roadways with U-shaped steel closed support显示文摘Open U-shaped steel arch supports are commonly used in large-section static-pressure roadways in coal mines that are more than 900 m deep;however,it is very difficult to control floor heave of roadways.In this paper,a U-shaped steel closed support with an inverted U-shaped steel arch in the floor is proposed as a method for improving the support effect of the surrounding rock during the process of floor heaving.This research established a mechanical model for the U-shaped steel closed support,and determined the reaction forces at the connection of a camber angle.Using the limit load method calculated the critical buckling load of the inverted U-shaped steel arch,and use of a strength check method tested the strength of the U-shaped steel material.A numerical simulation was conducted using the finite difference software FLAC3 D.The simulation results show that the U-shaped steel closed support is able to control the floor heave of roadways,which is successfully used in the West 11-2 development roadway of the Zhuji Mine in the Huainan mining area in China.The cumulative floor heave over two years was less than50 mm.Zhao Yiming Liu Na Zheng Xigui Zhang Nong 2015International Journal of Mining Science and Technology2015,25,5:4
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费