|
|
|
题名
|
作者
|
年代
|
出处
|
被引量
|
| 1 | Adult-to-adult living-donor liver transplantation: The experience of the Université catholique de Louvain显示文摘Background: Liver transplantation is the treatment for end-stage liver diseases and well-selected malignancies. The allograft shortage may be alleviated with living donation. The initial UCLouvain experience of adult living-donor liver transplantation(LDLT) is presented. Methods: A retrospective analysis of 64 adult-to-adult LDLTs performed at our institution between 1998 and 2016 was conducted. The median age of 29(45.3%) females and 35(54.7%) males was 50.2 years(interquartile range, IQR 32.9–57.5). Twenty-two(34.4%) recipients had no portal hypertension. Three(4.7%) patients had a benign and 33(51.6%) a malignant tumor [19(29.7%) hepatocellular cancer, 11(17.2%) secondary cancer and one(1.6%) each hemangioendothelioma, hepatoblastoma and embryonal liver sarcoma]. Median donor and recipient follow-ups were 93 months(IQR 41–159) and 39 months(22–91), respectively. Results: Right and left hemi-livers were implanted in 39(60.9%) and 25(39.1%) cases, respectively. Median weights of right-and left-liver were 810 g(IQR 730–940) and 454 g(IQR 394–534), respectively. Graft-to-recipient weight ratios(GRWRs) were 1.17%(right, IQR 0.98%-1.4%) and 0.77%(left, 0.59%-0.95%). One-and five-year patient survivals were 85% and 71%(right) vs. 84% and 58%(left), respectively. Oneand five-year graft survivals were 74% and 61%(right) vs. 76% and 53%(left), respectively. The patient and graft survival of right and left grafts and of very small( < 0.6%), small(0.6%–0.79%) and large( ≥0.8%) GRWR were similar. Survival of very small grafts was 86% and 86% at 3-and 12-month. No donor died while five(7.8%) developed a Clavien–Dindo complication IIIa, IIIb or IV. Recipient morbidity consisted mainly of biliary and vascular complications; three(4.7%) recipients developed a small-for-size syndrome according to the Kyushu criteria. Conclusions: Adult-to-adult LDLT is a demanding procedure that widens therapeutic possibilities of many hepatobiliary diseases. The donor procedure can be done safely with low morbidity. The recipient operation carries a major morbidity indicating an important learning curve. Shifting the risk from the donor to the recipient, by moving from the larger right-liver to the smaller left-liver grafts, should be further explored as this policy makes donor hepatectomy safer and may stimulate the development of transplant oncology. | Samuele Iesari Milton Eduardo Inostroza Nú?ez Juan Manuel Rico Juri Olga Ciccarelli Eliano Bonaccorsi-Riani Laurent Coubeau Pierre-Fran?ois Laterre Pierre Goffette Chantal De Reyck Beno?t Lengelé Pierre Gianello Jan Lerut | 2019 | Hepatobiliary & Pancreatic Diseases International2019,18,2: | 5 |
| 2 | Resource-constrained project scheduling: a survey of recent develop-ments显示文摘 | Herroelen W Reyck B D Demeulemeester E | 1998 | Computers and Operations Research1998,25,4: | 1 |
| 3 | The multi-mode resource- constrained project scheduling problem with generalized precedence relations 显示文摘 | DE REYCK B HERROELEN W | 1999 | European Journal of Operational Research1999,119,2: | 1 |
| 4 | Resource-constrained project scheduling,a survey of recent developments显示文摘 | Herroelen W De Reyck B Demeuhmeester E | 1998 | Computer & Operations Research1998,25,4: | 1 |
| 5 | The impact of project portfolio management on information technology projects 显示文摘 | Bert De Reyck Yael Grushka-Cockayne Martin Lockett etc | 2005 | International Journal of Project Management2005,23,7: | 1 |
| 6 | Resource-constrained project scheduling:A survey of recent development 显示文摘 | HERROELEN W DE REYCK B DEMEULEMEESTER E | 1998 | Computers and Operations Research1998,25,4: | 1 |
| 7 | A hybrid scatter sear-ch/electromagnetism meta-heuristic for the resource-constrained project scheduling problem显示文摘 | DEBELS D DE REYCK B LEUS R | 2006 | European Journal of Operational Research2006,169,3: | 1 |
| 8 | The impact of project portfolio management on information technology projects 显示文摘 | BERT DE REYCK | 2005 | International Journal of Project Management2005,23,2: | 1 |
| 9 | Resource-constrained project scheduling: a survey of recent developments显示文摘 | Herroelen W de Reyck B Demenlemeester E | 1998 | Computers & Operations Research1998,25,4: | 1 |
| 10 | A note on the paper 'resource-constrained project scheduling:notation, classification, models and methods' by Brucker et al显示文摘 | HERROELEN W S DEMEULEMEESTER E DE REYCK B | 2001 | European Journal of Operational Research2001,128,3: | 1 |
| 11 | Resource constrained project scheduling:a survey of recent de velopment显示文摘 | HERROELEN W REYCK B D DEMEULEMEESTER E | 1998 | Computers & Operations Research1998,25,4: | 1 |
| 12 | Resource constrained project scheduling:a survey of recent developments显示文摘 | HERROELEN W S DE REYCK B DEMEULEMEESTER E | 1998 | Computers and Operation Research1998,25,4: | 1 |
| 13 | A hybrid scatter search/electromagnetism meta- heuristic for project scheduling显示文摘 | Debels D Reyck B D Leus R Vanhoucke M | 2006 | European Journal of Operation Research2006,169,: | 1 |
| 14 | A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling显示文摘 | RANJBAR M DE REYCK B KIANFAR F | 2009 | European Journal of Operational Research2009,193,1: | 1 |
| 15 | Resource-constrained project scheduling: A survey of recent developments 显示文摘 | Herrolen W Reyck B D Demeulemeester E | 1998 | Computers & Operations Research1998,25,4: | 1 |
| 16 | A branch-and- bound procedure for the resource - constrained project scheduling problem with generalized precedence relations 显示文摘 | DE REYCK B HERROELEN W | 2000 | European Journal of Operational Research2000,111,1: | 1 |
| 17 | A hybrid scatter search electromagnetism meta-heuristic for project sched- uling显示文摘 | Debels D Reyck B D Leus R | 2006 | European Journal of Operational Research2006,169,2: | 1 |
| 18 | Resourceconstrained project scheduling: a survey of recent developments显示文摘 | Herroelen W De Reyck B Demeulemeester E | 1998 | Computers and Operations Research1998,25,4: | 1 |
| 19 | Milestone payments or royalties? Contract design for R&D licensing显示文摘 | Crama P Reyck B D Degraeve Z | 2008 | Operations Research2008,56,6: | 1 |
| 20 | A Hybrid Scatter Search/Electromagnetism Meta-- heuristic for Project Scheduling 显示文摘 | Dieter D de Reyck B Leus R | 2006 | European Journal of Operational Research2006,169,2: | 1 |