维普中文期刊产品整合服务
29篇 您的检索式:作者名="LOGENDRAN"
    题名 作者 年代 出处 被引量
1Pore structure controlling the carbonation of a hardened cement matrix blended with mineral admixture 显示文摘Wee T H Suryavanshi A K Logendran D 1999Adv Cem Res1999,11,2:1
2Two-machine Group Schedu- ling Problem with Blocking and Anticipatory Setups显示文摘Logendran R Sriskandarajah C 1993Eu- ropean Journal of Operational Research1993,69,3:1
3Total flow time minimization in a flowshop sequence-dependent group scheduling problem显示文摘SALMASI N LOGENDRAN R 2010Computers & Operations Research2010,37,1:1
4Scheduling unrelated parallel machines with sequence-dependent setups 显示文摘Logendran R McDonell B Smucker B 2007Computers & Operations Research2007,34,11:1
5Two-machine Group Scheduling Problems in Discrete Parts Manufacturing Withsequence-dependent Setups显示文摘Logendran R Salmasi N Sriskandarajah C 2006Computers b-Operations Research2006,33,:1
6Group scheduling in flexible flow shops 显示文摘Rasaratnam Logendran Sara Carson Erik Hanson 2005Int J Production Economics2005,95,3:1
7Design of manufacturing cells in the presence of alternative cell locations and material transporters显示文摘LOGENDRAN R KARIM Y 2003Journal of the Operational Research Society2003,54,10:1
8Tabu search-based heuristics for cellular manufacturing systerns in the presence of alternative process plans显示文摘LOGENDRAN R RAMAKRISHNA P SRIKANDARAJAH C 1994International Journal of Production Research1994,32,2:1
9Tabu Search- Based Heuristics for Cellular Manufacturing Systems in the Presence of Alternative Process Plans 显示文摘Logendran R Rarnakrishna P Srikandarajah C 1994International Journal of Production Research1994,32,2:1
10Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans显示文摘LOGENDRAN R RAMAKRJSHNAC P SRISKANDARAJAH C 1994International Journal of Production Research1994,32,2:1
11An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems显示文摘Omid Shahvari Nasser Salmasi Rasaratnam Logendran Babak Abbasi 2012International Journal of Production Research2012,,15:1
12Group scheduling in flexi- ble Flow shops 显示文摘Logendran R Carson S Hanson E 2005Inter-national Journal of Production Eco- nomics2005,95,:1
13Group Scheduling Problem:Key to Flexible Manufacturing Systems显示文摘R Logendran 1992Comp Ind Eng1992,23,:1
14Aggregate Production Planning~a Survey of Models and Methodologies显示文摘Nam S Logendran R 1992European Journal of Operational Re- search1992,61,3:1
15Sequence-dependent group scheduling problems in flexible flow shops 显示文摘Logendran R DeSzoeke P Barnard F 2006Inter- national Journal of Production Economics2006,102,:1
16A sonthinen a tabu search-based approach for scheduling job-shop type flexible manufacturing system s显示文摘Logendran R 1997Journal of Operational Research Society1997,48,:1
17Spatial scheduling for shape-changing mega-blocks in a ship building company显示文摘KOH S LOGENDRAN R CHOI D 2011International Journal of Production Research2011,49,23:1
18Two-machine group scheduling problem with blocking and anticipatory setups显示文摘LOGENDRAN R SRIAKANDARAJAH C 1993Europe Journal of Operatinal Research1993,,9:1
19An efficient tabu search algorithm for flexible flow shop sequence- dependent group scheduling problems显示文摘Shahvari O Salmasi N Logendran R 2012International Journal of Production Research2012,50,15:1
20Optimization of capacitated vehilce routing problem using PSO 显示文摘Venkatesan S R Logendran D Chandramohan D 2011International Journal of Engineering Science and Technology2011,3,10:1
返回顶部 每页显示:
共2页 首页 上一页 第1页 下一页 末页 /2 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费