维普中文期刊产品整合服务
131篇 您的检索式:作者名="Haouari"
    题名 作者 年代 出处 被引量
1Platelet function in hyportension 显示文摘El Haouari M Rogado JA 2009Blood Cells Mol Dis2009,42,:1
2Platelet signalling abnormalities in pa- tients with type 2 diabetes mellitus: A review显示文摘E1 Haouari M Rosado JA 2008Blood Ceils Mol Dis2008,41,1:1
3Effect of temperature on the performance of an anaerobic tubular reactor treating fruit and vegetable waste 显示文摘Bouallagui H Haouari O Touhami Y Ben Cheikh R Marouani L Hamdi M 2004Process Biochemistry2004,39,12:1
4A bi-objective model for robust resource-constrained project scheduling显示文摘AI-Fawzan M A Haouari M 2005Int J of Production Economics2005,96,2:1
5Discrete time cost tradeoff problem A decomposition-based solutiort algorithm for the budget version 显示文摘HAZIR O HAOUARI M EREL E 2010Computers & Operations Research2010,37,:1
6Lower bounds for scheduling on identical parallel machines with heads and tails显示文摘Haouari M Gharbi A 2004Annals of Operations Research2004,129,:1
7Heuristic algorithms for the two-stage hybrid flowshop problem 显示文摘Haouari M M' Hallah R 1997Operations Research Letters1997,21,:1
8Robust scheduling and robustness measures for the discrete time/cost trade-off prob- lem显示文摘HAZR O HAOUARI M EREL E 2010European Journal of Operational Research2010,207,:1
9Tight bounds for the identical parallel machine scheduling problem显示文摘Haouari M Gharbi A Jemmali M 2006International Transactions in Operational Research2006,13,:1
10An opti- mization-based heuristic for the robotic cell problem 显示文摘Carlier J Haouari M Kharbeche M etal 2010European Journal of Operation Research2010,202,:1
11A bi-objective model for robust resource-constrained project scheduling显示文摘A1-Fawzan M A Haouari M 2005Inter- national Journal of Production Economics2005,96,:1
12Effect of temperature on the performance of an anaerobic tubular reactor treating fruit and vegetable waste显示文摘Bouallagui H Haouari O Touhami Y 2004Process Biochemistry2004,39,12:1
13An EOQ lot sizing model with random supplier capacity显示文摘Hariga M Haouari M 1999International Journal of Production Economics1999,58,:1
14A bi-objective model for robust resource-constrained project scheduling 显示文摘AL-FAWZAN M A HAOUARI M 2005International Journal of Production Economics2005,96,2:1
15Supplier selection and order lot sizing modeling :A review 显示文摘Aissaoui N Haouari M Hassini E 2007Computers & Operations Research2007,34,12:1
16A computational study of the permutation flow shop problem based on a tight lower bound 显示文摘LADHARI T HAOUARI M 2005Computer & Operations Research2005,32,7:1
17An EOQ lot sizing model with random supplier capacity显示文摘Moncer Hariga Mohamed Haouari 1999International Journal of Production Economics1999,1,58:1
18Discrepancy search for the flexible Job-Shop scheduling problem 显示文摘HMIDA A B HAOUARI M HUGUET M 2010Computers & Operations Research2010,37,12:1
19A bi-objective model for robust resource-constrained project scheduling显示文摘AL-FAWZAN M A HAOUARI M 2005International Joumai of Production E-conomics2005,96,2:1
20Tight bounds for the identical parallel machine scheduling problem 显示文摘HAOUARI M GHARBI A JEMMALI M 2006International Transactions in Operational Research2006,13,6:1
返回顶部 每页显示:
共7页 首页 上一页 第1页 下一页 末页 /7 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费