维普中文期刊产品整合服务
89篇 您的检索式:作者名="Baykasoglu"
    题名 作者 年代 出处 被引量
1An ant colony for solving budget unconstrained dynamic facility layout problem显示文摘BAYKASOGLU A DERELI T SABUNCU I 2006Omega2006,34,4:1
2An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems显示文摘BAYKASOGLU A DERELI T SABUNCU I 2006International Journal of Management Science2006,34,4:1
3Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems 显示文摘BAYKASOGLU A OZBAKIR L SONMEZ A 2004Journal of Intelligent Manufacturing2004,15,6:1
4Using multiple objective tabu search and grammars to model and solve multi-objective flexible Job Shop scheduling problems显示文摘BAYKASOGLU A OZBAKIR L SONMEZ A I 2004Journal of Intelligent Manufacturing2004,15,6:1
5Self-adaptive global best harmony search algorithm for training neural networks显示文摘Kulluk S Ozbakir L Baykasoglu A 2011Pro- cedia Computer Science2011,,3:1
6Application of cost/benefitanalysis for surgical gown and drape selection:a case study显示文摘Baykasoglu A Dereli T Yilankirkan N 2009Am JInfect Control2009,37,3:1
7Stochastic U-line balancing using genetic algorithms显示文摘Baykasoglu A Ozbakr L 2006The International Journal of Advanced Manufacturing Technology2006,32,2:1
8A simulated annealing algorithm for dynamic facility layout problem显示文摘Baykasoglu A Gindy N N Z 2001Computers & Operations Research2001,28,14:1
9A simulated annealing algorithm for the dynamic layout problem显示文摘 NABIL N Z GINDY 2001Computers and Operations Research2001,,28:1
10An integrat ed framework for reconfiguration of cellular manufacturing systems using virtual cells 显示文摘SAAD S M BAYKASOGLU A GINDY N N Z 2002Production Planning and Controll2002,13,4:1
11Gene expression program-ming based due date assignment in a simulated Job Shop显示文摘BAYKASOGLU A GOQKEN M 2009Expert Systems with Applications2009,36,12:1
12Two-sided assembly line balancing using an ant-colony-based heuristic 显示文摘Baykasoglu A Dereli T 2005International Journal of Advanced Manufacturing Technology2005,36,56:1
13Two-sided Assembly Line Balancing Using an Ant-colony-based Heuristic 显示文摘Baykasoglu A Dereli T 2008International Journal of Advanced Manufacturing Technology2008,32,:1
14An ant colo- ny algorithm for solving budget constrained and unconstrained dynamic facility layout problems显示文摘BAYKASOGLU A DERELI T SABUNCU I 2006The International Jour- nal of Management Science2006,34,4:1
15Capability-based distributed layout and its simulation based analyses显示文摘Adil Baykasoglu Mustafa GOqken 2010Journal of Intelligent Manufacturing2010,21,4:1
16An improved firefly algo- rithm for solving dynamic multidimensional knapsack problems显示文摘Baykasoglu A Ozsoydan F B 2014Expert Systems with Applications2014,41,8:1
17Design optimization with chaos embedded great deluge algorithm 显示文摘Baykasoglu A 2012Applied Soft Computing2012,12,3:1
18An Ant Colony Algorithm for Solving Budget Constrained and Unconstrained Dynamic Facility Layout Problems 显示文摘Baykasoglu A Dereli T Sabuneu I 2006International Journal of Management Science2006,34,4:1
19Two-sided assembly line balancing using an ant-colony-based heuristic显示文摘BAYKASOGLU A DERELI T 2008International Journal of Advanced Manufacturing Technology2008,36,56:1
20Application of activity-based costing to a land transportation company:a case study显示文摘BAYKASOGLU A KAPLANOGLU V 2008International Journal of Production Economics2008,116,:1
返回顶部 每页显示:
共5页 首页 上一页 第1页 下一页 末页 /5 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费